This project involved the supply and construction of a large mezzanine floor and ancillaries within an existing warehouse. Our design made use of some existing foundations from an earlier concrete mezzanine and these were integrated with several new foundations for mezzanine support columns, a pit for a large goods lift, foundations for four lean storage lists and two scissor lifts. Access to the floor is via two stair cases and two doors onto the first floor of the adjacent office building.

The floor was designed to carry a high floor load and the whole structure was fire protected. The work was undertaken in close association with the client’s electrical contractor who installed power, lightings and heating for the project.

icon_chevron_down_lrg
This error message is only visible to WordPress admins

Error: API requests are being delayed for this account. New posts will not be retrieved.

There may be an issue with the Instagram Access Token that you are using. Your server might also be unable to connect to Instagram at this time.

Error: No posts found.

Make sure this account has posts available on instagram.com.

Get in touch

Request a callback